Machine Learning-Based Early Warning Systems for Predicting Cost and Schedule Overruns: A Conceptual Framework

Authors

Keywords:

machine learning, early warning system, cost overrun, schedule overrun, project risk prediction, earned value management, predictive analytics, conceptual framework, Machine Learning, Early Warning System, Cost Overrun, Schedule Overrun, Project Risk Prediction, Earned Value Management, Predictive Analytics

Abstract

Cost and schedule overruns remain a persistent and costly feature of large-scale infrastructure, construction, information technology, and public-sector projects, with deviations frequently exceeding half of the originally approved budget or timeline. Conventional monitoring practices, anchored in periodic manual reporting and static earned-value formulas, typically flag deviations only after corrective action has become difficult or expensive. This paper presents a conceptual framework for machine learning-based early warning systems (ML-EWS) capable of identifying overrun risk at considerably earlier stages of project execution than conventional methods allow. Drawing upon a structured synthesis of existing literature (2015–2026) and established theoretical foundations including Risk Management Theory, Systems Theory, and the Technology Acceptance Model (TAM) the study classifies the categories of predictive features relevant to overrun forecasting, compares the performance profiles of algorithms commonly applied to the problem (such as random forests, gradient boosting machines, support vector machines, artificial neural networks, long short-term memory networks, and Bayesian networks), and sets out an integrated architecture that fuses structured project management data with unstructured textual indicators processed through natural language techniques. A five-layer early warning framework is proposed, spanning data ingestion, feature engineering, model training and validation, risk scoring, and decision-support alerting. To address critical conceptual gaps regarding algorithmic validation, empirical lead-time claims, and performance metrics, this paper articulates a rigorous mathematical formalization of lead-time gain (ΔL), dynamic evaluation metrics (AUC-PR, Fβ-score), and synthetic portfolio simulation frameworks tailored to imbalanced overrun datasets. The paper further examines data governance implications, an illustrative simulation of risk scoring across a project portfolio, and the practical constraints limiting adoption within developing-country project environments such as Nigeria. Findings indicate that hybrid ensemble models drawing on financial, schedule, contractual, organizational, and textual features consistently outperform single-technique models, while explainability mechanisms such as SHAP remain indispensable to sustaining stakeholder confidence in model output. The paper concludes with testable conceptual propositions, a structured future research agenda, recommendations directed at project management offices seeking to institutionalize predictive analytics, and policy-level suggestions for national infrastructure oversight bodies.

Downloads

Download data is not yet available.

References

Ahiaga-Dagbui, D. D., & Smith, S. D. (2014). Rethinking construction cost overruns: Cognition, learning and estimation. Journal of Financial Management of Property and Construction, 19(1), 38–54. https://doi.org/10.1108/JFMPC-06-2013-0027

Bertalanffy, L. von. (1968). General system theory: Foundations, development, applications. George Braziller.

Cheng, M.-Y., & Hoang, N.-D. (2016). Slope collapse prediction using Bayesian framework with k-nearest neighbor density estimation: Case study in Taiwan. Journal of Computing in Civil Engineering, 30(1), 04014116. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000468

Davis, F. D. (1989). Perceived usefulness, perceived ease of use, and user acceptance of information technology. MIS Quarterly, 13(3), 319–340. https://doi.org/10.2307/249008

Doty, D. H., & Glick, W. H. (1994). Typologies as a unique form of theory building: Toward improved understanding and modeling. Academy of Management Review, 19(2), 230–251. https://doi.org/10.5465/amr.1994.9410210748

Flyvbjerg, B. (2014). What you should know about megaproject planning and management. Project Management Journal, 45(2), 6–19. https://doi.org/10.1002/pmj.21409

Hastie, T., Tibshirani, R., & Friedman, J. (2009). The elements of statistical learning: Data mining, inference, and prediction (2nd ed.). Springer. https://doi.org/10.1007/978-0-387-84858-7

Liu, Y., Zhang, W., & Chen, H. (2024). Federated learning for cross-organisational construction risk prediction: A privacy-preserving approach. Automation in Construction, 158, 105312. https://doi.org/10.1016/j.autcon.2023.105312

Lundberg, S. M., & Lee, S.-I. (2017). A unified approach to interpreting model predictions. Advances in Neural Information Processing Systems, 30, 4765–4774.

Odeyinka, H., Lowe, J., & Kaka, A. (2013). An evaluation of risk factors impacting construction cash flow forecast. Journal of Financial Management of Property and Construction, 18(3), 265–283. https://doi.org/10.1108/JFMPC-06-2012-0023

Petrusheva, S., & Zileska Pancovska, V. (2017). Traditional and innovative methods for cost estimation of construction projects. Balkan Journal of Applied Mathematics and Informatics, 1, 15–20.

PMI. (2021). A guide to the Project Management Body of Knowledge (PMBOK® guide) (7th ed.). Project Management Institute.

Ribeiro, M. T., Singh, S., & Guestrin, C. (2016). "Why should I trust you?": Explaining the predictions of any classifier. Proceedings of the 22nd ACM SIGKDD International Conference on Knowledge Discovery and Data Mining, 1135–1144. https://doi.org/10.1145/2939672.2939778

Sanni-Anibire, M. O., Zin, R. M., & Olatunji, S. O. (2020). Machine learning model for delay risk assessment in tall building projects. International Journal of Construction Management, 20(5), 465–477. https://doi.org/10.1080/15623599.2020.1768326

Sanni-Anibire, M. O., Hassanain, M. A., & Assaf, S. (2023). Explainable artificial intelligence in construction project management: Stakeholder trust and decision-making. Journal of Construction Engineering and Management, 149(4), 04023042. https://doi.org/10.1061/JCEMD4.COENG-12821

Wauters, M., & Vanhoucke, M. (2016). A comparative study of Artificial Intelligence methods for project duration forecasting. Expert Systems with Applications, 46, 249–261. https://doi.org/10.1016/j.eswa.2015.10.007

Xu, N., Ma, L., Wang, L., Deng, Y., & Ni, G. (2021). Extracting domain knowledge elements of construction safety management: Rule-based approach using Chinese natural language processing. Journal of Management in Engineering, 37(2), 04021001. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000881

Xu, Y., Li, H., & Wang, Z. (2023). BIM-integrated machine learning for real-time construction risk assessment. Advanced Engineering Informatics, 55, 101923. https://doi.org/10.1016/j.aei.2022.101923

Yang, Q., Liu, Y., Chen, T., & Tong, Y. (2019). Federated machine learning: Concept and applications. ACM Transactions on Intelligent Systems and Technology, 10(2), 1–19. https://doi.org/10.1145/3298981

Zhang, L., & Wang, H. (2025). Reinforcement learning for dynamic schedule optimisation in complex construction projects. Automation in Construction, 162, 105487. https://doi.org/10.1016/j.autcon.2024.105487

Downloads

Published

2026-10-09

How to Cite

Machine Learning-Based Early Warning Systems for Predicting Cost and Schedule Overruns: A Conceptual Framework. (2026). International Journal of Management, Policy and Administrative Studies (IJMPAS), 1(5), 42-57. https://ijmpas.com/journal/article/view/82